Customization: | Available |
---|---|
After-sales Service: | Twice/Year |
Warranty: | 30 Years |
Still deciding? Get samples of US$ 1/Ton
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material GRADE | 201, 202, 301, 304, 304L, 316, 316L |
Standard | ASME, ASTM, EN, BS, GB, DIN, JIS, etc |
Technique | Hot rolled / cold rolled |
Raw material source | JISCO,TISCO,BAOSTEEL or as your request |
Width | 10mm-1250 mm |
Thickness | 0.1mm-3.0mm |
Quantity | As your request |
Surface | 2B, BA, 8K, No.4 No.1, 8K, Mirror finish etc. |
Packaging | Standard export sea-worthy packing |
Delivery time | 1-15days |
Supply ability | S.S HR COIL= 1000 000 TONS/ year, S.S CR COIL= 800 000 TONS/ year, S.S pipe=200 000 TONS/ year |
Payment terms | L/C, T/T |
Application range | Pipe/tube making, building material, kitchen sinks/cutlery, baths, elevators, automotive application, industrial application, hardware-tools etc. |
Surface Finish | Definition | Application |
2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry, Construction material, Kitchen utensils. |
BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction. |
NO.3 | Those finished by polishing with No.100 to No.120 abrasives specified in JIS R6001. | Kitchen utensils, Building construction. |
NO.4 | Those finished by polishing with No.150 to No.180 abrasives specified in JIS R6001. | Kitchen utensils, Building construction, Medical equipment. |
HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building Construction. |
NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical tank, pipe. |
1. What's your MOQ?
A: 5 tons of mixed sizes for one container is acceptable
|
2.What's your payment terms?
A: 30% in advance by T/T, 70% will be before shippment basic on FOB; 30% in advance by T/T, 70% against the copy of BL basic on CIF.
|
3. What's your delivery time?
A: 5-15 working days send to port after deposit arrival
|
4. How long time for your company has been in business?
A: We are a gold manufacturer of construction materials for 20 years in steel industry.
|
5. Can we visit your factory to check production process and quality?
A: Yes, of course, welcome any time.
|
6: Do you have about mill certificate and material componential analysis report?
A:Yes, we have professional quality analysis department.
|